The house that was de-sided on December 5th has been moving along – although the weather hasn’t really been cooperating. With the exception of the facade’s second floor, all of the asphalt siding has been removed, and the first floor has been covered with new house wrap. As soon as the sub-zero temperatures let up, we’ll probably see a lot more activity!

Published in: on December 11, 2009 at 10:45 am  Comments (2)  

The URI to TrackBack this entry is: http://tannerdistrict.wordpress.com/2009/12/11/progress-on-419-cedar/trackback/

RSS feed for comments on this post.

2 CommentsLeave a comment

  1. I love the new door! The house is looking so great! It is exciting to see a new project underway in the midst of winter. My hat is off to all those who participated in the de-siding. That was a lot of work on a cold day.

  2. Is it done? I’d love to see what it to see what it looks like when it is!


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.