The house that was de-sided on December 5th has been moving along – although the weather hasn’t really been cooperating. With the exception of the facade’s second floor, all of the asphalt siding has been removed, and the first floor has been covered with new house wrap. As soon as the sub-zero temperatures let up, we’ll probably see a lot more activity!